Controval
Injection and conditioning

Water treatment

Filtration and treatment packages and ASME vessels for process and utility water.

Demineralized water filtration vessel, Monagas
Demineralized water filtration vessel, MonagasOne of ten ASME VIII Div. 1 pressure vessels fabricated in our workshops: five for amine filtration, five for water.
At a glance

Water treatment, built in our own workshops.

  • Filtration modules and vessels
  • Pressure vessels to ASME VIII Div. 1
  • Vessels fabricated in our workshops
  • Sized to your water quality and flow
Our work

Water packages we have built

Real projects, photographed in our workshops and at site. Ask us for references in your application.

Water injection skid installed at site, Sinovensa
Water injection skid installed at site, SinovensaSkid-mounted injection package with pumps, valves and instruments under a sun canopy, piped into the field network.
Water injection skid in our workshop, Sinovensa
Water injection skid in our workshop, SinovensaPump, valve and instrument skid during assembly before factory acceptance testing.
Chlorine dosing skid
Chlorine dosing skidChemical tank, dosing pump and control panel for water treatment on one skid.
Delivered
  • Ten ASME VIII Div. 1 pressure vessels: five amine filtration, five waterCarito Flow Station, Monagas, Venezuela
  • Water injection skidSinovensa
  • Chlorine dosing skidWater treatment
See all projects →
Learn more

How it works, configurations and standards

Open the sections you need. Everything stays on the page for reference and print.

01

How it works

Process diagram and step-by-step timeline

Our water treatment packages prepare process and utility water, with the filtration and treatment your process requires.

The vessels are built in our own workshops under ASME VIII Div. 1, so we control the fabrication from the first weld.

Carito Flow Station expansion (separation and purification capacity), Ezequiel Zamora Municipality, Monagas, Venezuela. Controval designed, selected materials for, manufactured, tested, inspected, sand-blasted and painted, assembled and transported ten pressure vessels: five for amine filtration and five for raw and demineralized water filtration. Engineering to ASME Section VIII Div. 1: calculation memory, COMPRESS, CAD drawings, bill of materials and equipment data sheets. Fabrication was planned with hold points for the mandatory ASME inspector visits together with customer inspection.

In the order the fluid passes through it. Select a step, use the arrows, or let it play.

backwash / draindPCHEMICALTANKdosing pumpANALYZER1Raw water2Feed pump3Strainer4Filtration vessels5Chemical dosing6Water quality7Treated waterCONTROL AND MONITORINGControl panelpressure, dP, flow, dosing, alarmsHMI / local indicationoperation and statusto yourSCADA

Typical schematic configuration, shown for reference only. The final design, equipment, instrumentation and applicable codes depend on the client's process conditions, specification and project requirements, and are defined during engineering.

Swipe sideways to see the whole diagram.

1 / 9
Step 1 of 9

Raw water inlet

Water from the source (well, river, network or process stream) enters through an isolation valve.

Step 2 of 9

Feed pump

A skid-mounted pump gives the pressure and flow the filters need, when the supply pressure is not enough.

Step 3 of 9

Strainer

Holds back coarse solids and debris to protect the pump, the filters and the instruments downstream.

Step 4 of 9

Filtration vessels

Vessels in parallel remove suspended solids. Differential pressure shows when to clean or backwash.

Step 5 of 9

Chemical dosing

A dosing skid injects the treatment chemical, for example chlorine, from a tank with a dosing pump, in the amount the process calls for.

Step 6 of 9

Water quality

Analyzers and instruments check the treated water, as the process requires, and send the signal to the control panel.

Step 7 of 9

Treated water outlet

Treated water leaves through the outlet isolation valve to storage, to the process or to the users.

Step 8 of 9

Backwash and drain

Drain connections let the filters be cleaned or backwashed and the rejected water sent to the disposal point.

Control and records

Control panel and SCADA

The panel shows pressures, differential pressure, flow and dosing, raises alarms and sends data to your SCADA.

02

Typical configurations and options

What goes on the skid and what can change
  • Filtration vesselsHorizontal or vertical pressure vessels to ASME VIII Div. 1, fabricated in our workshops
  • Number of vesselsOne or several in parallel; duty / standby or alternate cleaning
  • Filtration technologyStrainer, media, cartridge or bag filters, or membrane modules, per water quality
  • Building waterActivated carbon and UV water treatment skids for condominium buildings: design, selection of tanks, filters, equipment and instruments, automation, testing, installation and commissioning; modular enclosure with integrated control panel optional
  • Feed pumpsSkid-mounted pumps when the supply pressure is not enough
  • Chemical dosingChlorine or other chemical: tank, dosing pump and injection point
  • InstrumentationPressure, differential pressure and flow; analyzers as the process requires
  • Backwash and drainValves and connections for backwash and drain, manual or automatic
  • ControlsLocal panel and indication; signals to your SCADA
  • Piping and valvesMaterial suited to the water: carbon steel, stainless steel or plastic
  • Vessel materialsCarbon steel with protective coating, or stainless steel
  • Area classificationInstruments, panels and wiring selected for the classified area
  • MountingSkid-mounted modules, or stand-alone vessels with supports
  • Instrument brandsWe integrate Yokogawa, Flowserve, Magnetrol, Milton Roy, Pulsafeeder and Swagelok, and consider your preference
03

Standards and documentation

Design references and the documents we deliver

Designed to ASTM, ASME, ISO and API standards. The applicable codes are agreed per project.

Typical references

  • ASME VIII-1Pressure vessels: design, fabrication, inspection
  • ASME IIMaterials
  • ASME IXWelding and brazing qualifications
  • ASME B31.3Process piping
  • ASME B16.5Pipe flanges and flanged fittings
  • ASTM A516 / A240Carbon steel and stainless steel plate
  • NSF/ANSI 61Drinking water system components, for potable water only

Typical documentation package

  • P&ID
  • General arrangement
  • Vessel design calculations and drawings
  • Instrument datasheets
  • FAT procedure and report
  • Operation and maintenance manual

Factory acceptance test (FAT) in our workshops and site acceptance test (SAT) at the installation site.

Brands

Typical brands on this skid

Brands we represent, integrated alongside your preference.

Yokogawa
Flowserve
Magnetrol

See all brands →

From specification to start-up

One team, from engineering to the factory test

  1. Step 1

    Engineering

    Process, mechanical and instrumentation design from your specification.

  2. Step 2

    Fabrication

    Built and assembled in our workshops to the agreed codes.

  3. Step 3

    Factory test (FAT)

    Loop-by-loop checks, valve stroking and control verification, with your witnesses if you wish.

  4. Step 4

    Start-up

    Documentation, delivery and remote support.

Need one built for your process?

Send us fluid, flow, pressure and temperature, or just your idea. An engineer returns a proposed configuration.