Test separators
2-, 3- and 4-phase separators for well testing and flowback, skid or trailer mounted.

Well testing and flowback, on a skid or a trailer.
- 2-, 3- and 4-phase configurations
- Skid or trailer mounted
- ASME and NACE
- For well testing, flowback and pigging operations
What the skid looks like
Illustrative rendering of the configuration; real photos of our builds are on the projects page.

How it works, configurations and standards
Open the sections you need. Everything stays on the page for reference and print.
01How it works
Process diagram and step-by-step timeline
Test separators split the well stream into its phases so you can measure what the well produces.
We build 2-, 3- and 4-phase units, mounted on a skid or on a trailer, to ASME and NACE requirements. Fabrication quality is assured under an ISO 9000 scheme, with full traceability of each component.
Level controllers, level gauges, control valves and flow meters give accurate measurement of each separated fluid.
In the order the fluid passes through it. Select a step, use the arrows, or let it play.
Typical schematic configuration, shown for reference only. The final design, equipment, instrumentation and applicable codes depend on the client's process conditions, specification and project requirements, and are defined during engineering.
Swipe sideways to see the whole diagram.
Well stream in
The well stream arrives from the wellhead or choke manifold through an isolation valve. It is a mix of gas, oil, water and sometimes solids.
Inlet diverter
Slows the stream and changes its direction, so most of the gas separates from the liquid as soon as it enters the vessel.
Settling section
Liquids rest in the vessel so oil and water separate by density. Vessel size sets the time available. A 2-phase unit has no water section.
Mist extractor
Catches fine liquid droplets carried by the gas, so the gas leaves dry and its measurement is reliable.
Gas outlet and pressure
A pressure control valve holds the vessel pressure. The gas passes through a meter before it goes to flare or to the line.
Oil outlet and level
Oil spills over a weir into a bucket. A level control valve discharges it through an oil meter.
Water outlet and interface
The oil-water interface is held by a control valve on the water line, which has its own meter. Used in 3- and 4-phase units.
Solids removal
In a 4-phase unit, sand and solids settle at the bottom and are removed through a drain, which matters in flowback.
Measurement and safety
Pressure and temperature transmitters and a relief valve protect the vessel. The gas, oil and water readings feed the well test report.
02Typical configurations and options
What goes on the skid and what can change
- Phases2-phase, 3-phase or 4-phase
- OrientationHorizontal or vertical vessel, as the duty requires
- MountingSkid mounted, or trailer mounted for moving between wells
- Design codeASME VIII Div. 1 pressure vessel
- MaterialsCarbon steel, or NACE materials for sour service
- InternalsVanes, inlet deflector, baffles, weir plates and mist extractor; options as the duty requires
- Gas outletPressure control valve and gas meter
- Oil outletLevel control valve and oil meter
- Water outletInterface control valve and water meter (3- and 4-phase)
- Solids handlingSolids drain for 4-phase units
- SafetyPressure relief valve and instrumentation sized to the vessel
- InstrumentationPressure, temperature and level transmitters, gauges and local panel
- Area classificationInstruments, panels and wiring selected for the classified area
03Standards and documentation
Design references and the documents we deliver
Designed to ASTM, ASME, ISO and API standards. The applicable codes are agreed per project.
Typical references
- ASME VIII-1Pressure vessels: separator shell, heads and nozzles
- API 12JOil and gas separators
- NACE MR0175 / ISO 15156Materials for H2S-containing (sour) service
- API 520 / 521Pressure relief devices: sizing and relieving systems
- ASME B31.3Process piping on the skid
- ASME B16.5Pipe flanges and flanged fittings
- API RP 14CAnalysis, design, installation and testing of basic surface safety systems
Typical documentation package
- P&ID
- General arrangement
- Vessel and instrument datasheets
- Design calculations
- FAT procedure and report
- Operation and maintenance manual
Factory acceptance test (FAT) in our workshops and site acceptance test (SAT) at the installation site.
Typical brands on this skid
Brands we represent, integrated alongside your preference.





One team, from engineering to the factory test
- Step 1
Engineering
Process, mechanical and instrumentation design from your specification.
- Step 2
Fabrication
Built and assembled in our workshops to the agreed codes.
- Step 3
Factory test (FAT)
Loop-by-loop checks, valve stroking and control verification, with your witnesses if you wish.
- Step 4
Start-up
Documentation, delivery and remote support.
