Controval
Power and utilities

Boiler fuel regulation

Modular fuel regulation and feed unit for your boiler.

Boiler gas regulator skid, PDVSA
Boiler gas regulator skid, PDVSAParallel regulation runs with filters, regulators, relief and instrumentation feeding a boiler burner train.
At a glance

A modular fuel feed for your boiler.

  • Modular fuel regulation and feed
  • Adapted to your boiler and fuel
  • Skid-mounted and pre-assembled
  • Designed to ASTM, ASME, ISO and API standards
Concept

What the skid looks like

Illustrative rendering of the configuration; real photos of our builds are on the projects page.

Illustration: Boiler skid
Illustration: Boiler skidPackaged boiler with burner, steam drum, stack and instrumentation on one frame.
Delivered
  • Boiler gas regulator skidsPDVSA
  • Fuel gas regulation skid for a CO boiler, catalytic cracking plantEngineering, FAT and SAT
See all projects →
Learn more

How it works, configurations and standards

Open the sections you need. Everything stays on the page for reference and print.

01

How it works

Process diagram and step-by-step timeline

The fuel regulation unit prepares the fuel and delivers it to the boiler at the pressure and flow it needs.

It is modular, so we adapt it to your boiler and your fuel. We have delivered boiler gas regulator skids for PDVSA.

A complete modular unit with piping, supports, tubing, valve assemblies, filters, instrumentation, and wiring and junction boxes on the skid. Our engineering team develops detailed engineering from basic information and technical specifications. Qualified welders work in carbon steel, stainless steel and special alloys. Each skid is pre-assembled mechanically and electrically as far as possible, then inspected and tested to the applicable codes, standards and specifications.

Example, CO boiler of a catalytic cracking plant. Scope: detailed engineering, procurement, fabrication, assembly, FAT and SAT. Installed on the main fuel gas line, the fuel line to each burner, the main natural gas pilot line and the pilot line to each burner. Fuel gas main line operating conditions: flow 510 / 910 lb/h (min / max); pressure 101.5 / 68.2 / 43.5 psig (max / normal / min); temperature 158 / 104 / 86 F (max / normal / min).

In the order the fluid passes through it. Select a step, use the arrows, or let it play.

8Drains and ventsPDTregulators in series: active + monitor (typical)run Arun BSSVPTto ventFLOW METERoptionalFTBOILERburner train and BMS(boiler side)1Fuel supply2Filtration3Pressure regulation4Safety shut-off (opt.)5Pressure relief6Flow meter (opt.)7BoilerCONTROL AND INSTRUMENTATIONControl panelindication, alarms, tripsAlarms and tripslow / high pressure, filter ΔPBoiler controlsBMS and your DCS / PLC

Typical schematic configuration, shown for reference only. The final design, equipment, instrumentation and applicable codes depend on the client's process conditions, specification and project requirements, and are defined during engineering.

Swipe sideways to see the whole diagram.

1 / 9
Step 1 of 9

Fuel supply and isolation

Gas arrives at the skid through an isolation valve. Supply pressure and its variation set the regulator design.

Step 2 of 9

Filtration

A filter holds back solids and scale that would damage regulator seats and valves. Differential pressure shows when to service it.

Step 3 of 9

Pressure regulation

Parallel runs, each with isolation valves, reduce the supply pressure to the burner pressure. One run can be isolated while the other works.

Step 4 of 9

Safety shut-off (optional)

A safety shut-off valve closes the supply if the pressure goes out of limits. It is reset manually after the cause is cleared. It is separate from the burner safety shut-off valves of the boiler.

Step 5 of 9

Pressure relief

A relief valve protects the downstream piping and the burner train from overpressure and discharges to a safe location.

Step 6 of 9

Flow measurement (optional)

A flow meter records the fuel gas consumed by the boiler, for efficiency and reporting.

Step 7 of 9

Delivery to the boiler

Regulated gas leaves to the burner train of the boiler. Burner management and flame safety remain on the boiler side.

Step 8 of 9

Drains and vents

Low-point drains and vents allow servicing, purging and the safe removal of liquids or trapped gas.

Control and records

Instruments and control panel

Pressure and differential pressure signals feed the panel for indication, alarms and trips, and can go to the boiler controls or your DCS.

02

Typical configurations and options

What goes on the skid and what can change
  • FuelFuel gas; the unit is adapted to your boiler and fuel
  • Number of runsSingle run, or duty / standby runs to service one while the other works
  • Regulator typeDirect-acting, pilot-operated, or control valve with controller
  • Monitor regulatorActive + monitor in series, where extra protection is required
  • FiltrationFilter or strainer with differential pressure indication or transmitter
  • Safety shut-offSlam-shut valve on high and low pressure (optional)
  • Overpressure reliefRelief valve sized per project, discharging to a safe vent
  • Flow measurementOptional meter for fuel consumption of the boiler
  • Pilot gasSeparate pilot gas regulation, if the burner needs it
  • Instruments and panelGauges, pressure transmitters and a local panel with alarms; signals to your DCS or PLC
  • Area classificationInstruments, panels and wiring selected for the classified area
  • Materials and mountingCarbon or stainless steel; modular skid, with platform where required
  • Instrument brandsWe integrate Samson, Kimray, RMG, Farris, Yokogawa, Westlock and Swagelok, and consider your preference
03

Standards and documentation

Design references and the documents we deliver

Designed to ASTM, ASME, ISO and API standards. The applicable codes are agreed per project.

Typical references

  • ASME B31.3Process piping
  • ASME B31.1Power piping, for boiler external piping where applicable
  • ASME B16.34Valves: flanged, threaded and welding end
  • API 520 / 521Relief devices, and pressure-relieving systems
  • NFPA 85Boiler and combustion hazards code, boiler side
  • IEC 60079Equipment for explosive atmospheres, area classification
  • NFPA 70National Electrical Code

Typical documentation package

  • P&ID
  • General arrangement
  • Instrument datasheets
  • Calculations
  • FAT procedure and report
  • Operation and maintenance manual

Factory acceptance test (FAT) in our workshops and site acceptance test (SAT) at the installation site.

Brands

Typical brands on this skid

Brands we represent, integrated alongside your preference.

Samson
Farris
Yokogawa
Westlock

See all brands →

From specification to start-up

One team, from engineering to the factory test

  1. Step 1

    Engineering

    Process, mechanical and instrumentation design from your specification.

  2. Step 2

    Fabrication

    Built and assembled in our workshops to the agreed codes.

  3. Step 3

    Factory test (FAT)

    Loop-by-loop checks, valve stroking and control verification, with your witnesses if you wish.

  4. Step 4

    Start-up

    Documentation, delivery and remote support.

Need one built for your process?

Send us fluid, flow, pressure and temperature, or just your idea. An engineer returns a proposed configuration.

Get a quoteSkids