Controval
Protection and process

Pig launchers and receivers

Pig traps designed to ASME VIII Div. 1 with COMPRESS, with optional trolley.

Pig trap, San Tomé: launcher and receiver, 42 x 46 in, ANSI 600
Pig trap, San Tomé: launcher and receiver, 42 x 46 in, ANSI 600Barrel, reducer and closure of a pig trap designed to ASME VIII Div. 1 and fabricated in our workshops.
At a glance

Designed to ASME VIII Div. 1.

  • Designed to ASME VIII Div. 1
  • Calculated with COMPRESS software
  • Optional trolley
  • Built in our workshops
Delivered
  • Launcher and receiver pig traps, 42 x 46 in, ANSI 600, for the 42 in PTO-TAEJ pipelineSan Tomé, Venezuela
See all projects →
Learn more

How it works, configurations and standards

Open the sections you need. Everything stays on the page for reference and print.

01

How it works

Process diagram and step-by-step timeline

Pig launchers and receivers let you run cleaning and inspection tools through your pipeline without stopping it.

We design them to ASME VIII Div. 1 using COMPRESS software, and offer an optional trolley for handling the pig. Our San Tomé pig traps are 42 x 46 in, ANSI 600.

We supply pig traps as a skid-mounted package or as the launcher and receiver pressure vessels only, as you require. Pig traps are used in daily pipeline operation and in construction: cleaning to improve line efficiency, crack inspection, internal diameter measurement, corrosion problems, separation of products in the line, and removal of water after the hydrostatic test.

San Tomé district, Venezuela, 42 in PTO-TAEJ pipeline. The 42 x 46 in, ANSI 600 launcher and receiver pig traps send and receive internal cleaning tools and help assess the condition of the line, to plan maintenance of the collection lines. The design also allows intelligent tools for electronic line inspection. Scope: detailed engineering, material procurement, manufacture, non-destructive testing, hydrostatic test, sand-blasting and painting, packing, lifting and dispatch.

In the order the fluid passes through it. Select a step, use the arrows, or let it play.

pipelinepig travels with the flowPSventPIdrainPSventPIdrain1Loading2Barrel3Valves4Pipeline run5Arrival6Receiver7Recoverymain valvemain valvebypasskickerreceiving valvelaunch valveLAUNCHERRECEIVERLEGENDvalvePS pig signaller

Typical schematic configuration, shown for reference only. The final design, equipment, instrumentation and applicable codes depend on the client's process conditions, specification and project requirements, and are defined during engineering.

Swipe sideways to see the whole diagram.

1 / 9
Step 1 of 9

Loading and closure

With the trap isolated and depressurized, the closure is opened and the pig is loaded into the barrel. An optional trolley helps handle the pig.

Step 2 of 9

Barrel, vent and drain

The barrel is a pressure vessel larger than the line. Vent and drain connections and a pressure gauge allow it to be filled, purged and depressurized safely.

Step 3 of 9

Valves and launch

The kicker valve sends line flow behind the pig and the launch valve opens the way to the line. A signaller confirms that the pig has left.

Step 4 of 9

Pipeline run

The pig travels with the flow, cleaning the line or carrying inspection instruments, with no need to stop production.

Step 5 of 9

Arrival and receiving valves

The receiver is filled and pressurized before the pig arrives. With the receiving and bypass valves open and the main valve closed, flow is directed through the receiver. A signaller reports the pig arriving.

Step 6 of 9

Receiver barrel

The pig stops in the receiver barrel while a bypass line keeps the flow moving. Liquids and debris collected with the pig are held in the barrel.

Step 7 of 9

Isolate, drain and recover

The receiver is isolated, vented and drained. At zero pressure the closure is opened and the pig is removed.

Option

Optional trolley

A trolley carries the pig in and out of the barrel at the closure, so heavy pigs are handled with less effort.

Operation

Operating sequence

Each trap follows a set sequence of valve positions. We can supply a closure interlock and a written procedure, as agreed per project.

02

Typical configurations and options

What goes on the skid and what can change
  • Trap typeLauncher, receiver, or a launcher and receiver pair
  • PackageMajor and minor barrel, eccentric reducer, quick-opening closure, valves, pressure gauges, tees and barred tees, structural baseplate, drain piping and interconnecting piping
  • SizeBarrel and line size to suit the pipeline and the pig; San Tomé traps are 42 x 46 in
  • Pressure classANSI class to suit the design pressure; San Tomé traps are ANSI 600
  • Design codeASME VIII Div. 1 (UG-35) and ASME B31.3, B31.4 and B31.8, calculated with COMPRESS software
  • ClosureBolted blind flange or quick-opening closure, with interlock as required
  • ValvesMain, launch / receiving, kicker or bypass, vent and drain; manual or actuated
  • InstrumentsPressure gauges and pig signallers; transmitters when required
  • Pig handlingOptional trolley at the closure
  • MaterialsCarbon steel or alloy as the fluid requires; NACE materials for sour service
  • SupportsBarrel supports and saddles designed with the trap
  • CoatingSurface preparation and paint system to the site environment
  • TestingPressure test and inspection at our workshop before shipment
  • InterfaceTie-in connections to your pipeline, with flanged or welded ends
03

Standards and documentation

Design references and the documents we deliver

Designed to ASTM, ASME, ISO and API standards. The applicable codes are agreed per project.

Typical references

  • ASME VIII-1Pressure vessels: barrel, reducer and closure (including quick-actuating closures, UG-35.2)
  • ASME B16.5 / B16.47Pipe flanges and flanged fittings, standard and large diameter
  • ASME B31.4 / B31.8Liquid and gas pipeline systems at the tie-in
  • API 6DPipeline valves
  • ASTM A516 / A105Plate and forged steel materials
  • NACE MR0175 / ISO 15156Materials for H2S-containing (sour) service

Typical documentation package

  • P&ID
  • General arrangement
  • Vessel datasheets
  • Design calculations (COMPRESS)
  • FAT procedure and report
  • Operation and maintenance manual

Factory acceptance test (FAT) in our workshops and site acceptance test (SAT) at the installation site.

Brands

Typical brands on this skid

Brands we represent, integrated alongside your preference.

Versa
Flowserve
Yokogawa
Westlock

See all brands →

From specification to start-up

One team, from engineering to the factory test

  1. Step 1

    Engineering

    Process, mechanical and instrumentation design from your specification.

  2. Step 2

    Fabrication

    Built and assembled in our workshops to the agreed codes.

  3. Step 3

    Factory test (FAT)

    Loop-by-loop checks, valve stroking and control verification, with your witnesses if you wish.

  4. Step 4

    Start-up

    Documentation, delivery and remote support.

Need one built for your process?

Send us fluid, flow, pressure and temperature, or just your idea. An engineer returns a proposed configuration.

Get a quoteSkids