Controval
Injection and conditioning

Fuel gas conditioning

Clean, dry, regulated gas for engines, turbines, heaters, boilers and gas lift.

Fuel gas conditioning package, Jusepín
Fuel gas conditioning package, JusepínGas scrubber vessel (left), coalescing filter housings and the pressure regulation run with instruments and control panel, all on one skid with access platform.
At a glance

Clean, dry gas for the equipment that burns it.

  • Scrubber vessel, coalescing filters, regulation run, instruments and control panel
  • For engines, turbines, heaters, boilers and gas lift
  • Skid-mounted and pre-assembled
  • Designed to ASTM, ASME, ISO and API standards
Our work

Fuel gas and regulation packages, from model to delivery

Real projects, photographed in our workshops and at site. Ask us for references in your application.

3D model of a fuel gas conditioning skid
3D model of a fuel gas conditioning skidEngineering model from our design office: scrubber vessel, filter housings and regulation runs laid out on the skid before fabrication, so piping, access and instrument positions are fixed early.
Boiler gas regulator skid, PDVSA
Boiler gas regulator skid, PDVSARelated package: parallel regulation runs with filters, regulators, relief valve and instruments feeding a boiler burner train.
Delivered
  • Fuel gas conditioning package, Gas Compression Plant Jusepín 200 (NIF)Vepica, Jusepín, Venezuela
  • Boiler gas regulator skidsPDVSA
See all projects →
Learn more

How it works, configurations and standards

Open the sections you need. Everything stays on the page for reference and print.

01

How it works

Process diagram and step-by-step timeline

Engines, turbines, heaters and boilers need gas free of liquids and particles. Our fuel gas skids separate, filter and regulate the gas before it reaches your equipment. The same approach serves produced gas used in gas lift.

Each package is sized per field from the gas composition, flow and pressure.

The package protects engines and turbines from liquid slugs, solids down to 0.1 micron (depending on the filter rating) and liquid aerosols, which extends equipment life.

Vepica: fuel gas conditioning package for the Gas Compression Plant Jusepín 200 (NIF) project, with gas scrubber vessel, a pair of coalescing filters, interconnecting piping, valves, instrumentation and control panel, safety valves, drains and structural skid, all new materials tested to the relevant codes. Scope: engineering, mechanical calculations, detail and fabrication drawings, materials supply, manufacture, inspection, testing, transport and assistance for commissioning and startup. Deliverables: mechanical, civil, electrical and instrumentation drawings, pressure vessel design, 3D model, FAT/SAT protocol and Data Book. Manufactured in Houston, TX, and installed at Furrial, Jusepín, Venezuela, with field installation assistance.

In the order the fluid passes through it. Select a step, use the arrows, or let it play.

CLOSED DRAIN8Liquid drainsLTPDTrun Arun BPTto ventHEATER / METERoptionalto engines, turbines,heaters, boilers, gas lift1Inlet2Scrubber3Coalescing filter4Pressure regulation5Pressure relief6Optional7OutletCONTROL AND INSTRUMENTATIONControl panelindication, alarms, shutdown logicAlarms and shutdown outputshigh level, high differential pressureYour DCS / PLCstatus, alarms, remote signals

Typical schematic configuration, shown for reference only. The final design, equipment, instrumentation and applicable codes depend on the client's process conditions, specification and project requirements, and are defined during engineering.

Swipe sideways to see the whole diagram.

1 / 9
Step 1 of 9

Inlet and isolation

Gas from the field or header enters through an isolation valve. Inlet pressure and temperature set the design of everything downstream.

Step 2 of 9

Scrubber vessel

Gravity and a mist extractor remove liquid slugs, condensate and free water. Level is monitored and liquids are drained.

Step 3 of 9

Coalescing filter

Cartridges merge fine aerosol droplets into larger ones that drain out, and stop fine solids. Differential pressure shows when to change them.

Step 4 of 9

Pressure regulation

Regulators or control valves reduce and hold the pressure your equipment needs. Parallel runs allow one to be serviced.

Step 5 of 9

Pressure relief

A relief valve protects the downstream piping and equipment from overpressure and discharges to a safe location.

Step 6 of 9

Optional heating and metering

A heater can keep the gas above its dew point after pressure reduction. A flow meter records the gas consumed.

Step 7 of 9

Outlet to consumers

Conditioned gas leaves to engines, turbines, heaters and boilers, or to the gas lift system, through the outlet valve.

Step 8 of 9

Liquid drains

Liquids from the scrubber and the filters go to a closed drain or collection vessel, by manual or automatic drain.

Control and records

Instruments and control panel

Level, differential pressure and pressure signals feed the panel for indication and alarms. Signals can go to your DCS or PLC.

02

Typical configurations and options

What goes on the skid and what can change
  • Inlet separationVertical scrubber with mist extractor; horizontal where the liquid load requires it
  • FiltrationCoalescing filters, single or duty / standby; particulate filter as an option
  • Liquid handlingLevel gauge, switches or transmitters; manual or automatic drain to a closed drain
  • Differential pressureLocal indication or transmitter across the filters, with alarm
  • Pressure regulationSelf-operated regulators or control valves; one or two runs
  • Overpressure protectionRelief valves sized per project, discharging to a safe vent or flare tie-in
  • Heating (optional)Gas heater to stay above the dew point after pressure reduction
  • Gas measurement (optional)Flow measurement of the gas delivered to the consumer
  • Gas analysis (optional)H2S analyzer with alarm for sour gas service
  • Control panelLocal panel with alarms; serial or Ethernet signals to your DCS or PLC
  • Area classificationInstruments, panels and wiring selected for the classified area
  • MaterialsCarbon steel or stainless steel; NACE materials for sour (H2S) service
  • Instrument brandsWe integrate Yokogawa, Magnetrol, Farris, Samson, Kimray, RMG, KECO and Swagelok, and consider your preference
03

Standards and documentation

Design references and the documents we deliver

Designed to ASTM, ASME, ISO and API standards. The applicable codes are agreed per project.

Typical references

  • ASME VIII-1Pressure vessels (scrubber, filter housings)
  • ASME B31.3Process piping
  • ASME B31.8Gas transmission and distribution piping, for tie-ins
  • API 520 / 521Relief devices, and pressure-relieving and depressuring systems
  • MR0175 / ISO 15156NACE materials for sour (H2S) service
  • ASME B16.5Pipe flanges and flanged fittings
  • ASME IXWelding and brazing qualifications

Typical documentation package

  • P&ID
  • General arrangement
  • Instrument datasheets
  • Calculations
  • FAT procedure and report
  • Operation and maintenance manual

Factory acceptance test (FAT) in our workshops and site acceptance test (SAT) at the installation site.

Brands

Typical brands on this skid

Brands we represent, integrated alongside your preference.

Yokogawa
Magnetrol
Farris
Samson
KECO

See all brands →

From specification to start-up

One team, from engineering to the factory test

  1. Step 1

    Engineering

    Process, mechanical and instrumentation design from your specification.

  2. Step 2

    Fabrication

    Built and assembled in our workshops to the agreed codes.

  3. Step 3

    Factory test (FAT)

    Loop-by-loop checks, valve stroking and control verification, with your witnesses if you wish.

  4. Step 4

    Start-up

    Documentation, delivery and remote support.

Need one built for your process?

Send us fluid, flow, pressure and temperature, or just your idea. An engineer returns a proposed configuration.

Get a quoteSkids