Fuel gas conditioning
Clean, dry, regulated gas for engines, turbines, heaters, boilers and gas lift.

Clean, dry gas for the equipment that burns it.
- Scrubber vessel, coalescing filters, regulation run, instruments and control panel
- For engines, turbines, heaters, boilers and gas lift
- Skid-mounted and pre-assembled
- Designed to ASTM, ASME, ISO and API standards
Fuel gas and regulation packages, from model to delivery
Real projects, photographed in our workshops and at site. Ask us for references in your application.


- Fuel gas conditioning package, Gas Compression Plant Jusepín 200 (NIF)Vepica, Jusepín, Venezuela
- Boiler gas regulator skidsPDVSA
How it works, configurations and standards
Open the sections you need. Everything stays on the page for reference and print.
01How it works
Process diagram and step-by-step timeline
Engines, turbines, heaters and boilers need gas free of liquids and particles. Our fuel gas skids separate, filter and regulate the gas before it reaches your equipment. The same approach serves produced gas used in gas lift.
Each package is sized per field from the gas composition, flow and pressure.
The package protects engines and turbines from liquid slugs, solids down to 0.1 micron (depending on the filter rating) and liquid aerosols, which extends equipment life.
Vepica: fuel gas conditioning package for the Gas Compression Plant Jusepín 200 (NIF) project, with gas scrubber vessel, a pair of coalescing filters, interconnecting piping, valves, instrumentation and control panel, safety valves, drains and structural skid, all new materials tested to the relevant codes. Scope: engineering, mechanical calculations, detail and fabrication drawings, materials supply, manufacture, inspection, testing, transport and assistance for commissioning and startup. Deliverables: mechanical, civil, electrical and instrumentation drawings, pressure vessel design, 3D model, FAT/SAT protocol and Data Book. Manufactured in Houston, TX, and installed at Furrial, Jusepín, Venezuela, with field installation assistance.
In the order the fluid passes through it. Select a step, use the arrows, or let it play.
Typical schematic configuration, shown for reference only. The final design, equipment, instrumentation and applicable codes depend on the client's process conditions, specification and project requirements, and are defined during engineering.
Swipe sideways to see the whole diagram.
Inlet and isolation
Gas from the field or header enters through an isolation valve. Inlet pressure and temperature set the design of everything downstream.
Scrubber vessel
Gravity and a mist extractor remove liquid slugs, condensate and free water. Level is monitored and liquids are drained.
Coalescing filter
Cartridges merge fine aerosol droplets into larger ones that drain out, and stop fine solids. Differential pressure shows when to change them.
Pressure regulation
Regulators or control valves reduce and hold the pressure your equipment needs. Parallel runs allow one to be serviced.
Pressure relief
A relief valve protects the downstream piping and equipment from overpressure and discharges to a safe location.
Optional heating and metering
A heater can keep the gas above its dew point after pressure reduction. A flow meter records the gas consumed.
Outlet to consumers
Conditioned gas leaves to engines, turbines, heaters and boilers, or to the gas lift system, through the outlet valve.
Liquid drains
Liquids from the scrubber and the filters go to a closed drain or collection vessel, by manual or automatic drain.
Instruments and control panel
Level, differential pressure and pressure signals feed the panel for indication and alarms. Signals can go to your DCS or PLC.
02Typical configurations and options
What goes on the skid and what can change
- Inlet separationVertical scrubber with mist extractor; horizontal where the liquid load requires it
- FiltrationCoalescing filters, single or duty / standby; particulate filter as an option
- Liquid handlingLevel gauge, switches or transmitters; manual or automatic drain to a closed drain
- Differential pressureLocal indication or transmitter across the filters, with alarm
- Pressure regulationSelf-operated regulators or control valves; one or two runs
- Overpressure protectionRelief valves sized per project, discharging to a safe vent or flare tie-in
- Heating (optional)Gas heater to stay above the dew point after pressure reduction
- Gas measurement (optional)Flow measurement of the gas delivered to the consumer
- Gas analysis (optional)H2S analyzer with alarm for sour gas service
- Control panelLocal panel with alarms; serial or Ethernet signals to your DCS or PLC
- Area classificationInstruments, panels and wiring selected for the classified area
- MaterialsCarbon steel or stainless steel; NACE materials for sour (H2S) service
- Instrument brandsWe integrate Yokogawa, Magnetrol, Farris, Samson, Kimray, RMG, KECO and Swagelok, and consider your preference
03Standards and documentation
Design references and the documents we deliver
Designed to ASTM, ASME, ISO and API standards. The applicable codes are agreed per project.
Typical references
- ASME VIII-1Pressure vessels (scrubber, filter housings)
- ASME B31.3Process piping
- ASME B31.8Gas transmission and distribution piping, for tie-ins
- API 520 / 521Relief devices, and pressure-relieving and depressuring systems
- MR0175 / ISO 15156NACE materials for sour (H2S) service
- ASME B16.5Pipe flanges and flanged fittings
- ASME IXWelding and brazing qualifications
Typical documentation package
- P&ID
- General arrangement
- Instrument datasheets
- Calculations
- FAT procedure and report
- Operation and maintenance manual
Factory acceptance test (FAT) in our workshops and site acceptance test (SAT) at the installation site.
Typical brands on this skid
Brands we represent, integrated alongside your preference.





One team, from engineering to the factory test
- Step 1
Engineering
Process, mechanical and instrumentation design from your specification.
- Step 2
Fabrication
Built and assembled in our workshops to the agreed codes.
- Step 3
Factory test (FAT)
Loop-by-loop checks, valve stroking and control verification, with your witnesses if you wish.
- Step 4
Start-up
Documentation, delivery and remote support.