SCOPE OF WORK:

  • Detailed engineering, procurement, fabrication, assembling, FAT and SAT test.

INSTALLATION SITE:

  • Main line of fuel gas
  • Burners at each line
  • Main pilot line of natural gas
  • Each pilot lines

FUEL GAS MAIN LINE OPERATION CONDITIONS:

  • Flow: 510 / 910 LB / HR (Min. / Max.)
  • Pressure: 101.5 / 68.2 / 43.5 PSIG (Max. / Normal / Min.)
  • Temperature: 158 / 104 / 86 ºF (Max. / Normal / Min.)
en_USEnglish