SCOPE OF WORK:
- Detailed engineering, procurement, fabrication, assembling, FAT and SAT test.
INSTALLATION SITE:
- Main line of fuel gas
- Burners at each line
- Main pilot line of natural gas
- Each pilot lines
FUEL GAS MAIN LINE OPERATION CONDITIONS:
- Flow: 510 / 910 LB / HR (Min. / Max.)
- Pressure: 101.5 / 68.2 / 43.5 PSIG (Max. / Normal / Min.)
- Temperature: 158 / 104 / 86 ºF (Max. / Normal / Min.)